DOE CD-3b Review of the MINERvA Project
August 21, 2007
| Overview | CD-3b Documentation| Other Documents|
Overview of Charge and Experiment
- MINERvA Overview
(pdf)
- Review Agenda
(pdf)
- Review Charge
(pdf)
- DOE CD-3b Scorecard
(pdf with links)
- Scorecard Addendum describing documents not needed by
MINERvA for CD-3b
(pdf with links)
- Review Presentations by MINERvA Project Team (links to appear the week of August 14)
- Project Overview
(pdf)
- Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0)
(pdf)
- Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0)
(pdf)
- Scintillator Plane Assembly (WBS 3.0) Frames Absorbers and Stand (WBS 8.0) and Module Assembly and Veto Wall (WBS 9.0)
(pdf)
Required CD-3b Documentation
- Final Design Drawings and Specifications to begin contruction
(web page with links)
- Bid Packages
- Results of and Responses to Site Preliminary Design Review
- Construction Planning Document (5/30/07 Version with signatures)
(pdf)
- Project Execution Plan (2/22/07 Version with signatures)
(pdf)
- Resource Loaded Schedule (note: this schedule also includes tasks funded by NSF MRI grant)
- Detailed Cost Estimate
(pdf)
- System Functions and Requirements Document (Conceptual Design Report)
(pdf)
- Risk Management (Revision 12, August 7, 2007)
(pdf)
- Safety Documentation
- Hazard Assessment
(pdf)
- MINERvA NEPA Determination
(pdf)
- Preliminary Safety Assessment Document (with signatures) (pdf)
- Integrated Safety Management Document
(pdf)
- Burn Test Results
(pdf)
- Acquisition Strategy
(pdf with signed signature page)
- Value Management/Engineering Report
(pdf)
- Funding Profile
(pdf)
Other Documents
|