Director's CD-3b Readiness Review of the MINERvA Project
June 11, 2007
| Overview | CD-3b Documentation| Other Documents|
Link to the Directorate Web Page for this Review
Overview of Charge and Experiment
- MINERvA Overview
(pdf)
- Review Agenda
(pdf)
- Review Charge
(pdf)
- DOE CD-3b Scorecard
(pdf with links)
- Review Presentations by MINERvA Project Team
- Project Overview
(pdf)
- Scintillators (WBS 1.0) WLS Fibers (WBS 2.0) and Clear Fiber Cables (WBS 4.0)
(pdf)
- Phototubes (WBS 6.0) PMT Housing (WBS 5.0) and Electronics and DAQ (WBS 7.0)
(pdf)
- Scintillator Plane Assembly (WBS 3.0) Frames Absorbers and Stand (WBS 8.0) and Module Assembly and Veto Wall (WBS 9.0)
(pdf)
Required CD-3b Documentation
- Final Design Drawings and Specifications to begin contruction
(web page with links)
- Bid Packages
- Results of and Responses to Site Preliminary Design Review
- Report from DOE CD_1/2/3a Review
(pdf)
- Response to DOE CD_1/2/3a Recommendations
(pdf)
- Final Closeout Report from Director's CD-2/3a Review
(pdf)
- Response to Director's CD-2/3a Recommendations
(pdf)
- Construction Planning Document
(pdf)
- Project Execution Plan (2/22/07 Version with signatures)
(pdf)
- Resource Loaded Schedule (note: this schedule also includes tasks funded by NSF MRI grant)
- Microsoft Project File
(mpp)
- Gantt Chart
(pdf)
- Critical Path
(pdf)
- Costs Note: unless otherwise indicated, the costs in this table are unburdened FY06$ base costs
(pdf)
- Milestones
(pdf)
- Two-Page Summary
(pdf)
- WBS Dictionary
(pdf)
Detailed Cost Estimate
(pdf)
System Functions and Requirements Document (Conceptual Design Report)
(pdf)
Risk Management
(pdf)
Safety Documentation
- Hazard Assessment
(pdf)
- MINERvA NEPA Determination
(pdf)
- Preliminary Safety Assessment Document (with signatures) (pdf)
- Integrated Safety Management Document
(pdf)
- Burn Test Results
(pdf)
Acquisition Strategy
(3.2MB pdf with signed signature page) or
(323kB unsigned pdf)
Value Management/Engineering Report
(pdf)
Funding Profile
(pdf)
Other Documents
- Project Management Plan (2/22/07 Version with signatures)
(pdf)
- Technical Design Report
(pdf)
- Configuration Management Document
(pdf)
- Quality Assurance Plan
(pdf)