MINERvA Engineering
Main INjector ExpeRiment v-A
Minerva
Engineering Links:
1. PMT Box Cookie (PDF 50k) derived from PMT BOX. (PDF 312k) 2. PMT Box Cookie Holder (PDF 33k) derived from PMT BOX. (PDF 312k) 3. WLS Fiber lengths (PDF 30k) derived from Fiber lengths & Connector Quantities (PDF 34k) 4. Clear Fiber Lengths (PDF 28k) derived from Fiber lengths & Connector Quantities (PDF 34k) 5. Fiber Connector Quantities (PDF 21k) derived from Fiber lengths & Connector Quantities (PDF 34k) 6. Rectangular Scintillator Extrusion (PDF 36k) used in the Outer Detector (OD) as shown in OD fiber routing (PDF 232k) 7. Triangular Scintillator Extrusion (PDF 43k) used in the Scintillator Plane, as shown in X Plane (PDF 540k) The
balance of the drawings are presented to demonstrate the design status of key
portions of the project with descriptors of recent reviews. ·
Detector Drawings 1.
Detector Component drawings (PDF 1.7M) K. McFarland, J. Nelson, & R. Flight reviewed design specifics
with L2 managers; Nov 2006. 2. Nuclear
Target drawings (PDF 226k) All Target
designs presented by J. Kilmer for review at the Sept 2006 collaboration
meeting. 3. PMT
Box drawings
A. Mann, L. McMaster, & R. Flight
reviewed current configurations and drawing details; Oct 2006. · PMT Box detail drawing (PDF 402k) 4. Scintillator
Plane drawings
Last reviewed by J. Nelson, R. Bradford, D. Ruggiero & R. Flight;
Oct 2006. Multi-day workshops (9/2005
& 2/2006) to review design concepts and details. 5. Fiber
Routing drawings Last reviewed by J. Nelson, R. Bradford, D.
Ruggiero & R. Flight; Oct 2006.
Multi-day workshops (9/2005 & 2/2006) to review design concepts
and details. · Module fiber routing, (some steel frames shown in phantom) (PDF 320k) · Fiber routing at Frame Hook (PDF 237k) Reviewed as part of the Scintillator Plane assembly, stated above. · OD fiber routing (PDF 232k) Reviewed as part of the Scintillator Plane assembly, stated above. · Construction
Plans
Last reviewed during the Sept 2006
Collaboration meeting, between J. Kilmer & R. Flight. 1. Cavern Layout drawing (PDF 244k) 2. Wideband Hall Layout drawing (PDF 59k) 3. Strongback drawing (PDF 238k) 4. Strongback Floor Support drawing (PDF 174k) 5. Strongback on Transport Cart drawing (PDF 232k) (Cart used in cavern) 6. Bridge Dolly drawing (PDF 386k) (used for plane assembly) · Testing
Apparatus 1. Mapper drawings Design reviews between FNAL ES&H, R. Bradford, J. Kilmer, & R. Flight occurred Jan 2006, Mar 2006 & Oct 2006. · Mapper positioned for testing (PDF 2.2M) · Manufacturing
Conventions 1. Fiber Connector orientation drawings (PDF 331k) Convention established Feb 2006 between A. Mann, R. Ransome, J. Nelson, R. Bradford, & R. Flight and confirmed again in Oct 2006. · Supporting
Documents 1. Detector Construction (PDF 23k) A spreadsheet form schematic of the Detector assembly, reviewed by J. Nelson, R. Ransome, K. McFarland, & R. Flight Oct 2006 2. Fiber lengths & Connector Quantities (PDF 40k) Reviewed by S. Manly, R. Flight; Nov 2006 |